Archived board. This is a read-only archive of the Fast Tracks forums, active 2004–2016. Posting closed in May 2016; the board was preserved as a static site in 2026. Some images were lost before archiving and are marked where they appeared.

Fast Tracks

Model Railroading Discussion Forums

Return To The Fast Tracks Website

The Fast Tracks discussion forums have been closed. Click Here for more information.

It is currently Thu Aug 06, 2026 12:00 am

All times are UTC - 5 hours [ DST ]




Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 4 posts ] 
Author Message
PostPosted: Mon Sep 06, 2004 8:19 pm 
Offline

Joined: Mon Sep 06, 2004 8:08 pm
Posts: 1
Location: Thornton,TX
Howdy, All!! I was looking at the web site again, as I will be having the money shortly to be able to get the jigs and some materials fer the turnouts.

The questions I have are: How much rail is needed to construct a N scale #6?. Second: How many turnouts will be able to be constructed using the 500 pack of ties?.

The reason I ask, As I do want to try to hand lay some, as the cost in the long run wil be cheaper, as I need about 80-90 turnouts. I am using cd80 Atlas now, just does not look right to me. Like they say hind sight is 20/20, would've, could've, should've, oh well,,,adios

_________________
The SOO still lives in my little N scale world!!!!
http://www.railimages.com/gallery/gregburzynski


Top
 Profile  
 
 Post subject:
PostPosted: Sat Sep 11, 2004 9:46 am 
Offline
Site Admin

Joined: Fri May 07, 2004 11:22 pm
Posts: 311
Location: Port Dover, Ontario
(!empty($user->lang['QUOTE'])) ? $user->lang['QUOTE'] : ucwords(strtolower(str_replace('_', ' ', 'QUOTE'))):
The questions I have are: How much rail is needed to construct a N scale #6?. Second: How many turnouts will be able to be constructed using the 500 pack of ties?.


Hi,

If you go the the printable tie template page:

http://www.handlaidtrack.com/tie-templates.php

You can select the template for the specific turnout you are interested in building and print it out full size. Using a scale measure the overall length of the rails used, and add about 20%, this will give you a pretty close idea of the amount of rail required to produce one turnout. A piece of Micro Engineering rail is 36" long.

Using the template you can also count the number of ties required to complete the turnout, again, add a few extra as there may need to be 5 or 6 added to the end to get to the point of diverging the two routes into standard length ties.

_________________
Cheers!

Tim Warris
Fast Tracks
http://www.fast-tracks.net
service@fast-tracks.net


Top
 Profile  
 
 Post subject:
PostPosted: Wed Sep 29, 2004 1:27 am 
Hi Guys,

I built 26 HO #6 turnouts from 33 lengths (99 feet) of ME code 70 track.

Graham


Top
  
 
 Post subject:
PostPosted: Fri Oct 01, 2004 10:33 am 
Offline
Site Admin

Joined: Fri May 07, 2004 11:22 pm
Posts: 311
Location: Port Dover, Ontario
(!empty($user->lang['QUOTE'])) ? $user->lang['QUOTE'] : ucwords(strtolower(str_replace('_', ' ', 'QUOTE'))):
I built 26 HO #6 turnouts from 33 lengths (99 feet) of ME code 70 track.



Any pictures? Would love to see your work....

_________________
Cheers!

Tim Warris
Fast Tracks
http://www.fast-tracks.net
service@fast-tracks.net


Top
 Profile  
 
Display posts from previous:  Sort by  
Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 4 posts ] 

All times are UTC - 5 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
cron
Powered by phpBB® Forum Software © phpBB Group