Archived board. This is a read-only archive of the Fast Tracks forums, active 2004–2016. Posting closed in May 2016; the board was preserved as a static site in 2026. Some images were lost before archiving and are marked where they appeared.

Fast Tracks

Model Railroading Discussion Forums

Return To The Fast Tracks Website

The Fast Tracks discussion forums have been closed. Click Here for more information.

It is currently Thu Aug 06, 2026 12:00 am

All times are UTC - 5 hours [ DST ]




Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 2 posts ] 
Author Message
 Post subject: Stock rail grinding tool
PostPosted: Sat Nov 20, 2004 2:20 pm 
Hello Tim and Ron,

I'm not a machinest but the idea I had to make a stock rail grinding jig envolved using a version of your new point grinding jig.

You would have the same block of steel, and the rail would seat in the jig at a consistent distance from the side, code 40 on one side 55 on the other, The slot for the rail would go to both ends so you could slide the rail in from either end to make a left or right rail.

The hard part, (remembering I'm not a machinest) is to cut the steel block so you could file off a inch and a half of the rail side.
I was thinking that a possibility would be to have a 1.5 inch groove in the steel block grinded vertically from the top of the tool to the bottom. a 1 or 2 degree angle could be set while machining.

As far as taper goes, since its 1.5 inches long the modeler can or could accomplish that with careful filing. Since the rail would be held firmly in the tool it shouldn't be difficult. I dont know the difficulties in setting up or machining a tool like these, so take them with grain of salt.
Just an idea, perhaps it will bear fruit.

Rob


Top
  
 
 Post subject:
PostPosted: Sun Nov 28, 2004 3:27 pm 
Offline
Site Admin

Joined: Fri May 07, 2004 11:22 pm
Posts: 311
Location: Port Dover, Ontario
Hi Rob,

We do have a tentative design in the works for a modification to the PointForm tool to allow it to be used to remove the base of rail. I believe this will work well, but still have not made a prototype. It is on the list of new products we are developing...

_________________
Cheers!

Tim Warris
Fast Tracks
http://www.fast-tracks.net
service@fast-tracks.net


Top
 Profile  
 
Display posts from previous:  Sort by  
Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 2 posts ] 

All times are UTC - 5 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
cron
Powered by phpBB® Forum Software © phpBB Group