Archived board. This is a read-only archive of the Fast Tracks forums, active 2004–2016. Posting closed in May 2016; the board was preserved as a static site in 2026. Some images were lost before archiving and are marked where they appeared.

Fast Tracks

Model Railroading Discussion Forums

Return To The Fast Tracks Website

The Fast Tracks discussion forums have been closed. Click Here for more information.

It is currently Thu Aug 06, 2026 12:00 am

All times are UTC - 5 hours [ DST ]




Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 3 posts ] 
Author Message
PostPosted: Sun May 27, 2007 9:22 pm 
Offline

Joined: Mon Nov 21, 2005 9:28 pm
Posts: 44
I needed a nearly 4" center to center #6 double crossover, so I decided to bash one together from the components of a normal one plus a few bits. The result is just a tad larger. The top one is normal.


Attachments:
📷 Attachment lost: pairsixdc.jpg
200,477 bytes, uploaded 2007-05-28 — file destroyed in an April 2019 hosting restore, before this archive was made.

pairsixdc.jpg [ 195.78 KiB | Viewed 8298 times ]
Top
 Profile  
 
 Post subject:
PostPosted: Sun Jun 03, 2007 10:01 am 
Offline

Joined: Thu Feb 23, 2006 4:51 pm
Posts: 84
Hey Jim,

That's pretty nice trackwork! Have you thought about selling these as a sideline? ;-)

Terry


Top
 Profile  
 
 Post subject:
PostPosted: Sun Jun 03, 2007 11:45 am 
Offline

Joined: Mon Nov 21, 2005 9:28 pm
Posts: 44
jtfirth (!empty($user->lang['WROTE'])) ? $user->lang['WROTE'] : ucwords(strtolower(str_replace('_', ' ', 'WROTE'))):
Hey Jim,

That's pretty nice trackwork! Have you thought about selling these as a sideline? ;-)

Terry

Thank you, but actually, no. I haven't got a dedicated workplace to build them and my wife gets grumpy if I tie up the dining room table for too many days at a time. :-) I can't imagine how to ship something like that, either. It's pretty huge and consequently fragile. I'd hate to think what UPS could do to it.

It's not really all "that" special. It's just 4 #6 turnouts, a crossing made on the double crossover fixture (same as the turnouts, but separately), and two pieces of flex track. The only unusual thing about it is the pivoted points I used as preparation to building my first double slip. I used 1/32" brass rod bent into a "spike" and soldered to the points (with the foil removed from the top of the throwbar PC ties, which were gapped underneath). Then I basically just crimped over the "tail" of the spike that protrudes below the throwbar. That holds the points down in register with the stock rails quite nicely. They work quite smoothly and require a lot less force to move than soldered points. I'll be using 1/32" ties for the throwbar for my next experiment. Then there'll be nothing protruding below the QuikSticks. These don't cause a problem, really, since I use a Rotozip to cut a slot for the Tortoise wire under the throwbar, so there's nothing there to drag on.

Jim


Top
 Profile  
 
Display posts from previous:  Sort by  
Forum locked This topic is locked, you cannot edit posts or make further replies.  [ 3 posts ] 

All times are UTC - 5 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
cron
Powered by phpBB® Forum Software © phpBB Group